A masonry contractor hired me to prepare CMU rebar shop drawings for the construction of Brightview Laurel Point, a new senior living building in Mount Laurel, New Jersey. The project is located at Route 38, Ark Road and Fostertown Road. My name is Brian, and I have over 18 years of experience preparing rebar shop drawings for contractors throughout the United States. Below is a photo from the job site.

My scope of work was to detail the reinforcing steel for the concrete masonry unit (CMU) walls, including the elevator shafts, stair towers, firewalls, and other masonry walls. The completed package consisted of 14 shop drawing sheets, detailing 5,261 reinforcing bars weighing approximately 48,900 pounds. Below is an overview of the project, the reinforcing requirements, and some of the coordination involved in preparing the drawings.
CMU Wall Rebar Shop Drawings
The project involved 8-inch CMU walls at several locations throughout the four-story building. Our shop drawings included wall plans, reinforcing elevations, sections, bond beam details, and reinforcement at wall openings, corners, and intersections.
We started by reviewing the structural and architectural contract drawings to establish the wall locations, dimensions, floor elevations, and reinforcing requirements.
The first-floor shop drawing plan shows the reinforced CMU walls at Elevators 1 and 2, Elevators 3 and 4, and the four stair towers. Each wall elevation was then detailed separately to show the required vertical reinforcement, bar sizes, lengths, lap splices, and horizontal bond beams.
Some of the masonry walls extended through multiple floors, which meant that the reinforcing had to be detailed for each level of the building.
Elevator Shaft and Stair Tower Rebar Detailing
The elevator shafts and stair towers were among the more heavily reinforced masonry walls on this project.
The structural engineer’s masonry wall schedule specified different bar sizes and spacing depending on the floor level and wall location.
For example, Stair Tower 3 required #8 vertical reinforcing bars at 8 inches on center between the first and second floors. Between the second and third floors, the reinforcement changed to #6 bars at 8 inches on center. Between the third and fourth floors, the requirement changed again to #5 bars at 8 inches on center.
Elevators 3 and 4 also required #8 vertical bars at 8 inches on center between the first and second floors, with different reinforcing requirements at the upper levels.
These changes had to be reflected in the wall elevations and bar detailing. We couldn’t simply use one typical reinforcing arrangement for the entire height of each wall.

The wall elevations show the vertical reinforcing extending through the different floor levels, along with the bond beams and additional bars at the openings.
Some of the walls had a substantial amount of reinforcement concentrated around the elevator openings and wall jambs. These were among the more congested areas we had to detail.
Firewall and Other Reinforced CMU Walls
Our scope also included the building’s reinforced masonry firewall and other CMU wall locations.
The structural masonry schedule specified #5 vertical reinforcing at 32 inches on center for the firewall and other typical masonry walls. This was considerably lighter than the #8 bars at 8 inches on center required in some of the elevator and stair tower walls.
The shop drawings had to reflect these different conditions rather than applying the same reinforcement throughout the building.
The firewall elevation is a good example. It shows the wall extending through several levels, with reinforcing around multiple openings and horizontal reinforcement at the floor elevations.

CMU Bond Beams, Jamb Reinforcement, and Lap Splices
In addition to the vertical bars, we detailed the reinforcing for the horizontal bond beams and the additional bars required at masonry wall corners, intersections, ends, and openings.
The structural drawings required 8-inch-wide by 8-inch-deep continuous bond beams around the stair and elevator towers at the floor and roof elevations. These bond beams included two continuous #5 bottom bars, with additional hooked reinforcement at the corners.
The drawings also included details for jamb reinforcement at openings, masonry control joints, and intersections between reinforced walls.
Another important part of the work was the lap splicing of the vertical reinforcement.
Our detailing records included 30-inch lap lengths for #5 bars, 37-inch laps for #6 bars, and 58-inch laps for #8 bars. These dimensions were incorporated into the reinforcing layouts based on the project requirements and coordination.
The larger bars and longer lap splices made some of the reinforcement congested, particularly around the elevator shafts and stair towers.

Reviewing the Structural Drawings and Submitting RFIs
During our review of the contract drawings, we found several items that needed clarification before the reinforcing shop drawings could be completed.
One of the important issues involved structural Sheet S-106.
The masonry details on Sheet S-303 referenced a masonry wall reinforcement schedule on S-106, but that sheet had not been included in the original drawings provided to us.
This was important because S-303 showed the typical reinforcing details and lap requirements, while S-106 established the actual vertical bar sizes and spacing for the various walls and floor levels.
We submitted a Request for Information (RFI) asking for the missing sheet. The contractor subsequently provided S-106, which allowed us to establish the reinforcing requirements for the different masonry walls.

We also identified two different structural details for the elevator pit walls. One showed the CMU walls beginning at the top of the footing, while the other showed the walls beginning at the top of the slab.
Rather than choose between the two details ourselves, we requested clarification. The contractor confirmed that we were to follow Detail 2, the detail shown on the left in our RFI.
Additional requests involved architectural door schedules, wall elevations, and opening information. We received revised architectural door schedules to assist with the detailing.
This type of coordination is a normal part of my rebar shop drawing work. The structural engineer determines the reinforcing requirements. My job is to prepare the detailed drawings using that information and raise questions when the contract documents are incomplete or conflicting.
Reinforcing Steel Quantities
The completed CMU rebar shop drawing package included 5,261 reinforcing bars with a total detailed weight of 48,909 pounds.
The reinforcing consisted of #4, #5, #6, and #8 bars.
The largest quantities by weight were the #5 bars at 26,029 pounds and the #8 bars at 15,256 pounds. The package also included 7,307 pounds of #6 reinforcement and 317 pounds of #4 reinforcement.
The bar quantities included vertical wall reinforcement, bond beam bars, and other reinforcing shown in the shop drawings.
These quantities give an idea of the amount of steel involved in what might otherwise appear to be relatively straightforward CMU wall construction.
Completed CMU Rebar Shop Drawings
We completed and submitted our original 14-sheet CMU rebar shop drawing package on July 27, 2026. The drawings were issued to the contractor for review and submission to the structural engineer.
Following the submission, we also assisted with questions concerning reinforcing bar lengths and installation. I explained that the reinforcing sizes and structural requirements came from the engineer’s contract drawings. Any proposed changes to those requirements would need to be coordinated with the structural engineer.
The project is a good example of the work involved in preparing reinforced masonry shop drawings for a multistory building. The drawings had to account for different reinforcing requirements at each level, substantial vertical reinforcement, bond beams, wall openings, lap splices, and several RFIs.
Below are the CMU rebar shop drawings we prepared for the Brightview Laurel Point project.
Click the image above to view the 14-sheet CMU rebar shop drawing package in PDF format.